Now Serving All of Indiana - Licensed electricians dispatched from Indianapolis.

Emergency calls welcome: (317) 680-7907

Motor Control Center Installation

Professional motor control center installation built for industrial reliability, code compliance, and long-term performance.

State Licensed
Master Electricians
Permit & Inspection Handled
24-Hour Emergency Line
Workmanship Guaranteed

Licensed, Bonded & Insured

NEC Code Compliant

Same-Day Emergency Response

Permits Pulled & Inspections Managed

Workmanship Guarantee

Serving All of Indiana

5 Highlights on Motor Control Center Installation

Full MCC lineup installation

Kochs Electric installs free-standing, modular motor control centers complete with bus bar assembly, ground bus termination, and compartment-level wiring for three-phase distribution systems.

Branch Circuit & Dedicated Circuit Installation 

Our electricians mount and configure draw-out buckets, plug-in starters, and fixed breaker frames to match your facility’s load schedule and motor feeder requirements.

VFD and soft starter integration

We wire, program, and commission variable frequency drives and soft starters inside MCC enclosures, coordinating control wire routing with power wire separation standards.

Arc flash labeling and safety compliance

Every installed MCC receives proper arc flash labels, nameplates, and torque-verified connections per NFPA 70E and NEC requirements.

End-to-end commissioning

From meggering conductors to phase rotation verification and overload relay calibration, we test every circuit before energizing the system.

460+
Homes Serviced
92%
Same-Day Response
4+
Years of Experience
100%
Code-Compliant Work

Why Choose Our Motor Control Center Installation

Founded by Master Electrician David Koch (Indiana License #EC21400047) and serving Indiana industrial facilities since 2008, Kochs Electric brings qualified, hands-on expertise to every motor control center installation. We carry general liability and workers’ compensation insurance on every project. Our electricians are trained to work on medium-voltage and low-voltage MCC lineups across manufacturing, water treatment, and industrial facilities.

We don’t cut corners on terminations. Every lug gets torqued to spec. Every conductor gets labeled and traced back to the panel schedule. We pull and route cable through conduit and cable tray with clean, organized runs that make future troubleshooting straightforward.

Our team coordinates directly with your project schedule. We sequence energization steps, communicate lockout/tagout procedures with your safety team, and verify interlock wiring before any live work begins.

Kochs Electric holds the licenses and insurance your project requires. We’ve installed MCC lineups from small 200-amp distribution panels to large multi-section switchgear assemblies with integrated PLCs and current transformers.

We stand behind our work. Every installation includes a documented commissioning report, torque records, and a wiring diagram review. Serving manufacturing and industrial facilities throughout Indianapolis, Carmel, Fishers, and Indiana – call (317) 680-7907 to discuss your MCC project.

Recent installations include a four-section Square D Model 6 MCC for an Indianapolis water treatment facility – 14 motor starters, six VFD bays, and full arc flash labeling per NFPA 70E, commissioned across two planned weekend outages to keep the plant running; and a six-section Allen-Bradley MCC replacement for a Carmel food packaging plant, where the aging fusible switchgear was causing monthly nuisance trips, replaced with properly rated overload relays and calibrated before energization with documented torque records handed off to the maintenance team.

 

motor control center installation square
residential electrical services wide

Ready to Get Started?

Contact our licensed team today for a clear, written quote with no surprises. We serve all of Indiana.

Call (317) 680-7907

Signs You Need Motor Control Center Installation

1

You're adding new motor loads to an existing facility:

When a plant expansion calls for new conveyor motors, pump stations, or HVAC equipment, your existing distribution panel may not have the capacity or the compartment space to handle additional starters and overload relays. A new MCC lineup gives you the branch circuits, bus bar capacity, and overcurrent protection your added loads require.

2

Your current control equipment is outdated or tripped frequently:

Older fusible switch gear with worn contactors and unbalanced bus connections causes nuisance trips and overloaded circuits. Replacing aging equipment with a modern, properly rated MCC restores reliable motor control and reduces downtime.

3

You're commissioning a new construction project:

New industrial buildings, water treatment plants, and manufacturing facilities need a motor control center installed before equipment startup. Kochs Electric coordinates with the general contractor to mount, wire, and commission the MCC on schedule.

4

Your facility is upgrading to VFD-controlled motors:

Retrofitting variable frequency drives into an existing MCC requires proper enclosure ventilation, shielded cable routing, and control transformer sizing. We configure and integrate VFDs correctly so they don’t interfere with upstream overcurrent protection or downstream motor loads.

5

You need a dedicated control panel for a specific process:

Some operations require a standalone, enclosed control panel with pilot lights, push buttons, selector switches, and a PLC. Kochs Electric designs, wires, and programs these panels to integrate cleanly with your MCC and one-line diagram.

Fully Licensed & Insured

State of Indiana

We Pull All Permits

You don’t lift a finger

NEC Code Compliant
Every project, every time
Workmanship Guarantee
We come back if anything fails

Our Motor Control Center Installation Process

1

Site Survey and Load Review

We review your one-line diagram, panel schedule, and motor load list. We confirm bus bar ratings, feeder conductor sizes, and enclosure placement before ordering equipment.

2

Equipment Delivery and Staging

We coordinate delivery of the MCC lineup, conduit, wire, and hardware. We stage materials and verify that all buckets, breaker frames, and control components match the project specifications.

3

Mounting and Structural Assembly

Our electricians set the free-standing enclosure on strut or unistrut bases, level and anchor the sections, and assemble the bus bar connections between MCC sections.

4

Conduit and Wire Installation

We bend and install conduit, pull conductors through raceways and cable tray, and route control wire separately from power wire inside the wireway.

5

Termination and Torque

Every conductor gets stripped, crimped with the correct lug, and torqued to the manufacturer’s specification. We label and tag every wire at both ends.

6

Testing and Commissioning

We megger all feeders, verify phase rotation, calibrate overload relays, test interlock circuits, and confirm VFD and PLC programming before energizing the system.

Brands We Use

Kochs Electric installs and services motor control centers and components from the industry’s most trusted manufacturers:

Square D
Square D 
Eaton
Eaton
Allen-Bradley
Allen-Bradley
Siemens
Siemens
ABB
ABB
Cutler-Hammer 
Cutler-Hammer 
Leviton
Leviton
Hubbell
Hubbell
Panduit
Panduit
Square D
Square D 
Eaton
Eaton
Allen-Bradley
Allen-Bradley
Siemens
Siemens
ABB
ABB
Cutler-Hammer 
Cutler-Hammer 
Leviton
Leviton
Hubbell
Hubbell
Panduit
Panduit

We work only with rated, listed equipment.

Other Services

Motor control center installation

MCC installation services

Industrial electrical panel installation

Commercial MCC installation

Motor control panel installation

Three-phase motor starter wiring

Industrial motor control center

Electrical MCC setup

VFD integration and commissioning

MCC commissioning service

Motor control center wiring

Overload relay calibration electrician

Motor control center replacement

MCC upgrade and retrofit

Arc flash compliant MCC installation

FAQs About Motor Control Center Installation

A motor control center is an enclosed, modular assembly of motor starters, circuit breakers, disconnect switches, and control components mounted in a common bus bar structure. It centralizes control of multiple motors from a single location.

You need a new MCC when you’re adding significant motor loads, building a new facility, replacing outdated switchgear, or integrating VFDs and PLCs into your motor control system.

Installation time depends on the number of sections, the complexity of the conduit system, and the commissioning requirements. A standard four-section MCC installation typically takes three to seven days from mounting to energization.

Yes. We coordinate de-energization windows, apply lockout/tagout procedures, and sequence the work to minimize production impact. We’ve completed MCC installations in live facilities across multiple industries.

Every motor control center installation by Kochs Electric includes full commissioning — meggering conductors, verifying phase rotation, testing overload relays, calibrating VFDs, and confirming all interlock and control circuits before the system goes live.

Our electricians follow NFPA 70E procedures on every job. We establish an electrically safe work condition through lockout/tagout, verify de-energization with a voltage tester, and wear rated PPE whenever working near energized equipment.

Same-Day Emergency Dispatch Available

Indiana's Trusted Residential Electricians

Licensed. Insured. NEC compliant. We pull permits and schedule inspections so you don’t have to. Call us today to get started.